Work you can drive to and stand on

A selection of completed and ongoing projects. More jobs and photographs are being added.

Showing 10 of 10 projects

Flood intervention on Tudun Wada I & II bridges, Kafin Maiyaki–Tudun Wada–Saminaka Road (R302)

Roads & Drainage · Kano

Flood intervention on Tudun Wada I & II bridges, Kafin Maiyaki–Tudun Wada–Saminaka Road (R302)

Special intervention works addressing flood damage on two bridge crossings, including a two-cell box culvert at Ch 52+700, Tunburko.

Period
From May 2024
Value
₦504 million
Rehabilitation of a critical washout at km 1+500, Gidanwaya–Gwadogwado Road

Roads & Drainage · Kaduna

Rehabilitation of a critical washout at km 1+500, Gidanwaya–Gwadogwado Road

Reinstatement of a failed section in Jama'a LGA, restoring a road link that had been cut by washout.

Period
From June 2024
Value
₦429 million
Administrative building, Federal Polytechnic Orogun

Buildings · Delta

Administrative building, Federal Polytechnic Orogun

A new administrative complex for the polytechnic, delivered with in-house engineering and project management.

Period
From June 2022
Value
₦500 million
Mini stadium, Federal Polytechnic Orogun

Buildings · Delta

Mini stadium, Federal Polytechnic Orogun

Sports facility for the Delta Central Senatorial District campus, including field works and spectator provision.

Period
From January 2024
Value
₦230 million
Indoor sports arena with facilities, Federal Polytechnic Orogun

Buildings · Delta

Indoor sports arena with facilities, Federal Polytechnic Orogun

An indoor arena with sporting facilities serving students and the wider community.

Period
From October 2023
Value
₦220 million
Access road from Agwada to Apawu with two side drains

Roads & Drainage · Nasarawa

Access road from Agwada to Apawu with two side drains

Completion of a community access road in Kokona LGA, with drainage to both sides.

Period
September 2023
Value
₦80 million
2 km internal roads, River Plaza, Lugbe

Roads & Drainage · Abuja (FCT)

2 km internal roads, River Plaza, Lugbe

Estate roads built with polymer and solid-base stabiliser — a method that keeps the topsoil in place.

Period
From March 2014
Value
₦90 million
Worship centre development, Redeemed Christian Church of God, Jeddo

Buildings · Delta

Worship centre development, Redeemed Christian Church of God, Jeddo

Design and construction of a worship centre delivered on a fixed programme.

Period
October – December 2018
Value
₦30 million
Facilities maintenance, RCCG Mega Parish, Chevron Clinic Road, Warri

Project Management · Delta

Facilities maintenance, RCCG Mega Parish, Chevron Clinic Road, Warri

Two years of planned and reactive maintenance across several buildings and services.

Period
April 2019 – April 2021

Project Management · Ebonyi

Structural redesign and project management, Ebonyi 30,000-seat stadium

Structural redesign of a major stadium, with project management through to construction handover.

Period
July 2021 – February 2022